No longer available

2021 Pratt and Whitney FT8 Mobile Pac Gas Turbine Package

Available quantity

4

Location

Connecticut

Description


FT8® MOBILEPAC®

FT8® MOBILEPAC®Gas Turbine Package


The FT8®MOBILEPAC® gas turbine package requires a small footprint utilizing a 72 by 53 foot area.

Very little advanced site preparation is required, and no foundation or concrete pad is necessary for installation of the unit. The unit is transportable by land, sea, or air and modularly packaged for quick, worldwide delivery and installation.

  • Output:60 Hz/50 Hz:31 MW/29 MW(Dual Frequency)
  • Fuel: Dual Fuel (Gas/Oil)
  • Starting Time<10 minutes (cold start to full power)



Specifications

ManufacturerPratt and Whitney
ModelFT8 Mobile Pacs
Year2021
Stock NumberED00462